Build your dream home for under $3500, Cobb - reprinted at InspectApedia.com (C) 20118Driveways, Walks, Ditches & Drywell Construction
Chapter 22 of How to Build Your Dream Home © 2020 InspectApedia.com

Chapter 22 of BUILD YOUR DREAM HOME

This article series provides an updated version of Hubbard Cobb's Your Dream Home, illustrated by Sigman-Ward, first published by Wm. H. Wise & Co. New York, 1950.

From site selection and obtaining financing through each step in construction of a single family home the simple procedures and drawings in this book are still useful for anyone building or repairing a home or other small structure.

InspectAPedia tolerates no conflicts of interest. We have no relationship with advertisers, products, or services discussed at this website.

- Daniel Friedman, Publisher/Editor/Author - See WHO ARE WE?

Chapter 22

DITCHES AND DRY WELLS; DRIVEWAYS AND WALKS

Rainfall Disposal

If you are building in a location where there are storm sewers, the discharge from the roof gutters can be connected into them with drain tile and your problem is over. For those without this convenience, there are several alternate plans.

It is a bad idea to allow the water from gutters to flow from the openings of the downspouts onto the earth. In the first place, there is a good possibility that this water will eventually find its way into the basement. Another drawback is that the water will wash away the topsoil in this area and make it impossible to grow a lawn or have a garden in the immediate area. Sometimes a eoncrete slab is put down right

under the downspout and this deflects the water somewhat, but it is not too efficient. A better method is to have a concrete strip around the entire foundation wall at grade level. This should be 3' wide and there should be a slight joint between it and the foundation wall. The joint can be packed with asphalt felt, tar or caulking compound.

Dry Wells and Ditches

The most effective way to take care of rain water is to bring it from the downspouts to a dry well or blind ditch. A dry well can be built exactly like a cesspool. The opening of the downspout is connected to it by means of drain tile laid underground. Joints should be packed tight with mortar and the top of the dowmspout should be covered with a wire cage to prevent leaves and other debris from flowing into the dry well and eventually filling it up. A very simple type of dry well can be made by taking the bottom out of a barrel and sinking it in the ground. Fill the barrel up with small rocks and then bring in a line from the downspout. Wire netting is placed over the top of the barrel and this in turn is covered with topsoil. A blind ditch is nothing more than a long ditch filled with rocks. The line from the downspout is brought into the ditch and then the ditch is covered with topsoil. The ditch should have a slight pitch so that the water will drain through it and be absorbed by the surrounding soil.

DRIVEWAYS

Concrete Driveways

A good solid driveway from the main road up to your house is essential, not only for the convenience of the family, but so that deliveries of fuel, groceries, etc., can be made with a minimum of effort. In planning a safe driveway there are two main points to consider. First of all, it should not slope too steeply to the road. Try to grade your driveway so that it is as level as possible. Another safety factor is to provide enough room at the end of the drive or at some other point so that a car or small truck can be turned around. Backing down a steep drive into a busy thoroughfare can be a very risky business.

There are two types of concrete drive that you can use. One is the ribbon type of drive, which is made of two ribbons of concrete 2' wide with a space between them of 2T0". This is the least expensive type of drive to build, but even with curbs on the outer edges of the ribbon, there is a chance that a careless driver will run off the ribbons and damage the adjoining lawn or gar-


Fig. 1. Ribbon type of driveway, with and without curbs.


den. The slab type of concrete drive with curbs on the edges is much better, for there is less possibility of driving off it.

Building a Ribbon-Type Drive

It is very important when building this type of drive that the sub-base be compact and solid. If it is not, your drive is going to crack very easily. If the subsoil is well drained, you do not need any special base, but if it is clayey, you should use a base of gravel or cinders 6" thick under the slab. The slab itself should be 5" thick unless heavy trucks are going to go over it, in which ease it should he 6" thick. See Fig. 1.

The first step in making the driveway is to lay out the forms. Either 2" x 6" or 2" x 8" lumber can be used for this job. The pieces are set on edge and stakes driven in along the outside to hold them in place. You will need spacers the width of the ribbon placed between the two side forms to hold them the right distance apart. They should be placed every 6 feet. A ribbon without curbs should be 2' wide, but if you plan on a curb, increase this to 2'6” for each ribbon. Fig. 1 shows a simple method of forming the curb. If

there are curves in the drivewav, the

forms for these can be made out of

plywood.

Expansion Joints

You will need an expansion joint in the drivewav every 40 feet or so. You

+*    4'

should also have one where the drive-

vJOINT PILLED WITH BITUMINOUS MATERIAL-

MAY BE DUSTED WITH CEMENT

Fig. 2. An expansion joint between two concrete surfaces filled with a bituminous material.

way joins the apron of the garage or any other concrete or masonry work. If expansion joints are not used, there is danger of the concrete’s cracking. Expansion joints can be made by placing a strip of asphalt felt between two sections before the fresh concrete is poured, or by leaving a space and filling it later with a bituminous compound. See Fig. 2.

Pouring the Concrete

Refer to the table given in Chapter 5 for the correct mixture to use for this job. The entire ribbon is not poured in one operation. Alternate 6-foot sections

>CORNERS ROUNDED WITH EDGING

TOOL TO PREVENT CHIPPING

Fig. 3. The edges of adjoining sections of concrete should he rounded off to prevent their chipping.

Fig. 4. A simple type of concrete slab driveway.


are poured and then, when the concrete is sufficiently hard, the spacers are removed and the remaining sections are poured. This allows for a slight expansion joint between each 6-foot section. The corners of the sections should be rounded with an edging tool to prevent chipping. See Fig. 3.

A Slab-Type Drive

Drives of this sort without curbs should be 6'10" wide. See Fig. 4. If curbs are to be installed, the over-all width of the drive is increased to 7'4", which allows for two curbs 6" thick on each side. See Fig. 5. The same precautions in preparing the sub-base and using a fill in clayey soils apply to this type of drive as to the ribbon drive. The slab type of drive should be 6" deep if it is to handle heavy trucks. To allow for proper drainage, it is best to have the top of the concrete slab about 2" above the finished grade. The driveway should also be given a slight crown so that water will drain off. Fig. 6 shows a driveway with such a crown. A board with a hollowed-out edge is used to

Fig. 5. Curbs on the edges of the driveway will prevent vehicles from running

off the concrete strip and damaging the lawn or garden.


make the crown. This board is placed with its ends on the top of the form boards and is then worked down along a section of the fresh concrete, molding it to the slight crown desired. The forms for a slab driveway, along with the expansion joints, the mixture, and the method of pouring are just the same as those used for the ribbon type.

When you are working over the surface with a wood float, make certain not to remove the crown.

WALKS

Concrete Walks

■ai'-oT WIDER THAN DRIVEWAY

71

f CROWN

Fig. 6. A concrete walk or drive should he given a slight crown so that water will drain off easily. Detail at top of picture shows the board used to make the crown.

Fig. 7. Forms for making concrete flagstones can be made out of 2"x4"s.

You can have either concrete-slab walks or concrete-flagstone walks. A slab walk should be 4' wide and 4" thick. For small, back entrance walks, you can reduce the width to 3' but the thickness should remain the same as for the wider walks.

The subsoil should be graded and tamped down so that it is solid. If the soil is not well drained, you will need a 6" cinder base under the concrete, just as you do for a driveway. If you find that the walk must go around a tree, be sure to make allowance for the growth of the tree. If you do not, you will find that the tree will break up vour walk as it grows.

Forms for the walk can be made out of 2" x 4"s on edge with stakes on the outside to hold them in place and sepa-rater pieces running between the two sides. The location of these pieces will depend on how long you want each square of concrete to be. As a rule, they

are placed every 4' or 6' apart. You

will need expansion joints for this type

of walk every 40 feet or so and at all

&

the points where the walk joins other masonry. The walk should be given a slight crown so that water will drain

Fig. 8. Two attractive designs for brick    sand or on a concrete slab with a mortar

walks. The bricks can be laid either in bed.


off it easily. Be sure that the forms are level. Alternate sections are poured first. After each section has been poured, work it over with the strike board to give it the proper crown. After each section has had time to set for a few hours, the surface can be finished off with a wood float.

Concrete Flagstones

There are several ways to make a concrete-flagstone walk. One method is to construct a form to make the flagstones with and, when they are hard, to set them in place. Fig. 7 shows a simple type of form for this purpose made out of 2" x 4"s. This form will produce flagstones for a walk 18" wide, but of course, you can use any arrangement of the stones to produce any width of walk vou want. The bottom of the form is made of sheathing boards.

The form should be put together on a level piece of ground and the nails

SAND IN £ JOINTS

HARD-BURN ED BRICK

NOTE-IT IS IMPORTANT, ESPECIALLY THOROUGHLY DRAIN THE SAND OR CINDER BED. DISPLACEMENT DUE TO FROST IS POSSIBLE IN THIS TYPE OF WALK

ON SAND OR CINDERS

Fig. 9. How a brick walk or terrace can be laid on cinders or sand.


CEMENT MORTAR    IP BRICKS ARE LAID WITH TIGHT

OR SANDED JOINTS')    PITCH \ MORTAR JOINTS. PITCH WALK fci!

3*CONCRETE BASE (l TO © MIXTURE)    Vi TO \*SETTING BED

/VOr^-USE A 4"SAND OR CINDER BED ON CLAY SOIL AND DRAIN THOROUGHLY

ON CONCRETE

Fig. 10. Brick walk or terrace with concrete base.


should not be driven in all the wav be-

•I

cause this will make it difficult to remove them after the concrete is hard. Let the heads stick out about Ya" or so. Oil the inside of the forms to prevent the concrete from cracking. Pour the concrete into the forms and after it has had a while to set, finish off the surface with a wood float. At the end of two days, the forms can be stripped off, but be careful not to damage any still soft concrete. Put the blocks someplace where they will not be damaged and

keep them covered with damp burlap or straw for at least ten days before

they are put into use.

Another method of making a concrete-flagstone walk is to pour the concrete into holes made in the lawn. The first step here is to mark out the walk with strings. After this, dig out about 4" of sod and soil in whatever shape you want the flagstones to be. Make sure that the edges of these holes are upright. ’When this has been done, the concrete can be poured into the holes.

CEMENT MORTAR OR SAN060 JOINT5 ^

PITCH Yd

TO 1“ SETTING BED OP MORTAR OR BEO OF SAND

:■■    - a;'v. i A'-:    /////

•*« ////' jL’-’v

. < } > J.Mi-vii////. :'-V: v.;-■ .* t£'Y.-*£4f-£r: *

:    ^ v. :•? : iky:

• • ••• , 15-’• vreq

4“SANO OR CINDER    ^PPPiy

\ v -• . iliL -

BED ON CLAY SOIL

Fig. 11. Brick walk on concrete bade with bricks set up on end.

JOINTS AVERAGE 34 IN WIDTH

MORTAR

r/A/'Vk::

Y/A

' // /> A-::.-:.

4    •    •    *    •    •    *    •

• • • « •

• • • • • • .

... • * . . • .

• « . •

•..... . * . •• .

. • • * •••*

1 •••

•• • #

.    4 •• • / A . • • • • • . ♦    • -

4    .'•*.••••    *    *    .    

. • • ^ *

. •    ■    •    *    •    A

• - •

k-:

O • - A    *    A

/ . •

* . .    *

,* • *

• •    ^    •

•A.    A .    •    ..

**• V '* • . * * 4.* • •• a

- . •    . •    •    • A, • *    • . • • * • • / *.    •    ..........

*    •    ; . *. *    * W* •

-• *    4    * * *    .    •    *    .....

- • . • • . * . * *.

.    *    •    6.    ’• a    •

• • * •

*    * • • • - . * . <"

*    -    *    • • j>

. * • A * • • ' *

A •    * .•

*    ’    .    *    • A    . .

* * . /

. * . • . * * • • *>

• • •.    • • , .    • _ • , 4 • ’• • «**••*’

*.*!• .vr.

• • • *    . I    *#•

1 „ • % 1

•    • V

• •

?

• .

, l    • • V 7    • \*f.

•    V * . -    *

1 * . t . •    • •

0

'

V    !    1

i“to flagging (slate, bluestone, limestone, or

CAST STON E)

I"MORTAR BED

3 TO4 CINDER CONCRETE SLAB


I \"jO 14*4


• • *


i

. *

EARTH

Fig. 12. Slate laid over a concrete base with mortar. This is the best type of con-with the joints between slabs of slate filled struction to use on outdoor terraces.


fc TOS CINDER SU8-5ASE


Brick Walks

A brick walk can be made by placing the bricks on a concrete slab or over a base of sand. In warm climates, the bricks are often placed right over the earth, but this typj of construction is not satisfactory where there is frost.

Fig. 8 shows some of the interesting patterns that you can use in a brick walk.

If bricks are to be set on a sand or cinder base, the first step after marking out the dimensions of the walk with parallel lines, is to dig for the sub-base.

If the ground is not well drained, you

may have some trouble with this walk

*

in spite of the 4" sand or gravel base. After the excavation has been made, the sand or cinders should be poured in and packed down solidly. The hard-faced bricks are then laid right over this base without mortar. A space of Vi" is left between the bricks. When the walk is finished, sand is sprinkled over the surface and swept down into the joints with a broom. Hosing down the walk after this operation will pack the sand into the joints. Apply any additional sand necessary to fill the joints to the top of the bricks. See Fig. 9.

A brick walk on a concrete base is much more durable than one put over a sand base but, of course, it requires much more work. You will need a 4" bed of cinders or sand under the concrete if the soil is not well drained. The • concrete base should be 3" thick. This base should be poured in the same manner as a concrete walk, that is, it should be poured in alternate sections with expansion joints where necessary. Over the concrete base, a or thicker setting-bed of mortar is applied. This is given a slight crown so that water will drain off the finished walk. The bricks are dampened and then set into this base. The joints between the bricks can be packed with mortar or they can be

left open and filled with sand. See Figs. 10 and 11.

Natural Flagstones

Natural flagstones of slate, limestone or bluestone make an excellent material for the terrace or the walks. They can be laid on either a concrete slab or on a base of cinders. For the most part, when the stones are used for a terrace or some other spot where furniture is going to be placed, they should be set in concrete. This will eliminate that common hazard of sitting down in a chair and having it suddenly list over to one side as one of the legs sinks down into the earth between two stones. See Fig. 12.

When the stones are going to be set in concrete, you want a 6" cinder base

6"TO 8 CINDER SUB-BASE (WET THE CINDERS AND TAMP THEM TO A HARD, EVEN SURFACE)

EARTH

Fig. 13. Slate laid over a ci

[-•—MORTAR JOINT TtO i'/q. WIDE

1*4 TO 2*FLAGGING

(slate, bluestone, limestone, or

CAST stone;

i“sand compacted as a CUSH ion

FOR TH E FLAGS

base with mortar between the sections of slate.

under a 4" slab. The stones are set in down until they are a solid mass. Over a 1" mortar bed with %" joints be- this base, a layer of sand 1" thick should tween the stones. The joints should be be applied. The stones are then put filled with mortar. When the stones are in place and the joints between them laid without a concrete base, you want filled with either earth or mortar. See about 8" of cinders that are packed Fig. 13.


...

Continue reading at LANDSCAPING the PLOT - next chapter in this book, or go to book contents at BUILD YOUR DREAM HOME, or select a topic from the closely-related articles below, or see the complete ARTICLE INDEX.

Or see these

Recommended Articles

Suggested citation for this web page

DITCHES & DRYWELLS, DRIVEWAYS & WALKS at InspectApedia.com - online encyclopedia of building & environmental inspection, testing, diagnosis, repair, & problem prevention advice.


Or see this

INDEX to RELATED ARTICLES: ARTICLE INDEX to BUILDING ARCHITECTURE

Or use the SEARCH BOX found below to Ask a Question or Search InspectApedia

Or see

INDEX to RELATED ARTICLES: ARTICLE INDEX to BUILDING DAMAGE, DISASTER, REPAIRS

Or use the SEARCH BOX found below to Ask a Question or Search InspectApedia

Ask a Question or Search InspectApedia

Questions & answers or comments about how to identify the architectural style of buildings and building components

Try the search box just below, or if you prefer, post a question or comment in the Comments box below and we will respond promptly.

Search the InspectApedia website

Note: appearance of your Comment below may be delayed: if your comment contains an image, photograph, web link, or text that looks to the software as if it might be a web link, your posting will appear after it has been approved by a moderator. Apologies for the delay.

Only one image can be added per comment but you can post as many comments, and therefore images, as you like.
You will not receive a notification
when a response to your question has been posted.
Please bookmark this page to make it easy for you to check back for our response.


Comment Form is loading comments...

 

IF above you see "Comment Form is loading comments..." then COMMENT BOX - countable.ca / bawkbox.com IS NOT WORKING.

In any case you are welcome to send an email directly to us at InspectApedia.com at editor@inspectApedia.com

We'll reply to you directly. Please help us help you by noting, in your email, the URL of the InspectApedia page where you wanted to comment.